Case Studies

Meads Court
The client’s lift had broken down, following a call out visit it was established that a specific battery, only manufactured by the lift manufacturer, was required to bring the lift back into service.

Stafford Court
The lift at this residential block was extremely unreliable, regularly breaking down at inconvenient times. Another lift company had attended and could not identify the fault.

Devonshire Park Hotel, Eastbourne
The owner of this hotel in Eastbourne contacted us after another company informed them that the entire lift control system would have to be replaced at a significant cost.

Marine Court
Marine Court is a Grade II listed Art Deco building on the south coast and the client needed to retain the lifts’ original character whilst improving reliability.

De La Warr Pavilion
The De La Warr Pavilion is a prestigious arts building on the south coast. Hiwire Lifts identified that the ram seal on their hydraulic lift had developed a leak.

Residential Block
A hydraulic lift failed in a residential block of flats the week before Christmas. The lift serviced all five floors, and quick repair was paramount.